Accessory Dwelling Units (ADUs)
A successful ADU starts with understanding what your property allows and how the new space needs to work for its users.
Think Beyond Square Footage. An ADU needs to do a lot within a limited footprint. A thoughtful design considers privacy, access, natural light, storage, and how the new living space relates to the existing home and property.
Start with the property. Is there room for a detached ADU, or would converting or adding to an existing structure make more sense? Setbacks, utilities, site conditions, zoning, and construction requirements all shape what is possible. Identifying those constraints early helps turn the available space into a practical, well-planned home.
An experienced guide through a complex project
I want you to know I have worked with many contractors over the years, both professionally and personally and have never been as impressed nor have I found the integrity I received with your work. It’s always a touchy situation when you do work in a residential remodeling situation – lots of personal feelings involved. Your company has far surpassed my expectations.
Debra T, Poway
Before You Build, Plan.
Project Development is the first phase of our integrated design-build process. Before construction begins, we work through the layout, priorities, constraints, selections, scope, and budget, using construction knowledge to inform the project as it develops.
Project Development represents a relatively small portion of the overall construction investment, but the work can have an outsized impact on the result. We discover better solutions, reduce the risk of expensive changes, and help you make informed decisions about where your investment matters most.